All concrete will crack. Several steps are taken to control/minimize cracking. 

 

These steps include:

  • The use of type 1A Portland cement

  • Using fiber mesh in every mix and cutting

  • control/expansion joints approximately every two and one half feet, to allow the curbing to flex.